Constructing and starting of Substation 110/20/6 kV for the power supply of industrial complex of foundry in Sremska Mitrovica, Serbia

We were commissioned by ‘Sirmium Steel’ foundry to build a connection overhead line with 110 kV voltage level, and construct and put into work Substation 110/20/6 kV as well as low-voltage distribution network for the needs of the whole industrial complex.