Overhead line 2x110kV Substation Bitola 3 - Substation Bitola 4 with the reconstruction of Substations Bitola 2, 3, 4, Macedonia
We were commissioned by MEPSO Macedonia to deliver equipment and build a transmission line 2x110kV and 20km long, and simultaniosly build 2x110kV cable line 1 km long, and reconstruct three existing substations (Bitola 2, 3, 4)